Monitoring of gully erosion at ERA Ranger uranium mine Northern Territory, Australia, January 1998
Internal Report 274
Bell JRW & Willgoose GR
Supervising Scientist Division
Department of the Environment, 1998
Download
Full report
- Monitoring of gully erosion at ERA Ranger uranium mine Northern Territory, Australia (PDF - 7377 KB)
Chapters of the report
- Preliminary pages, Chapters 1 & 2 - Monitoring of gully erosion at ERA Ranger uranium mine Northern Territory, Australia (PDF - 958 KB)
- Chapter 3 - Monitoring of gully erosion at ERA Ranger uranium mine Northern Territory, Australia (PDF - 1859 KB)
- Chapter 4 - Monitoring of gully erosion at ERA Ranger uranium mine Northern Territory, Australia (PDF - 652 KB)
- Chapter 5 - Monitoring of gully erosion at ERA Ranger uranium mine Northern Territory, Australia (PDF - 1617 KB)
- Chapter 6 - Monitoring of gully erosion at ERA Ranger uranium mine Northern Territory, Australia (PDF - 1720 KB)
- Chapter 7, references and appendices - Monitoring of gully erosion at ERA Ranger uranium mine Northern Territory, Australia (PDF - 580 KB)
About the report
As part of the proposed rehabilitation at Ranger Uranium Mine, ERARM, investigation into the long term erosional stability of the final design landforms is currently being conducted.
The steep batter slopes of the proposed landform are considered highly susceptible to erosion, with previous investigations highlighting possible problems caused by the development of gullies through the containment structure.
This project constitutes one aspect of this assessment process.
The aims of this project were to:
- Firstly, initiate a gully on the steep batter slopes of the Northern Waste Rock Dump.
- Secondly, to monitor the development of the gully, and hydrology of the gully catchment.
These two components constituted the field trial and were conducted with the assistance of the Office of the Supervising Scientist, eriss and ERA Ranger Mine.
- The third objective, was assessment of the capability of the landfonn evolution model SIBERIA to predict the extent, depth and width of gullies fonned on the steep waste rock slopes,
- and finally, by comparison between observed and predicted landfonns, ascertain dominant erosional processes, and assess implications of additional erosion modules on these predictions.
SIBERIA was adapted to represent the batter - gully catchment study site, and validated through direct comparison between predicted and observed landforms. Modification of the homogenous initial landform to incorporate heterogeneity, increased catchment outlet width, and implementation of rudimentary armouring module, have encapsulated the dynamism of the development process observed on site.
Depths of erosion are comparable to those observed, and behaviour of gully development is mimicked by model simulations shown here.
Before you download
Some documents are available as PDF files. You will need a PDF reader to view PDF files.
List of PDF readers
If you are unable to access a publication, please contact us to organise a suitable alternative format.

