EPBC Act

Public notices

Referral detail

Define your search

List:   Period:   Search by referral number or partial text:

How to use this site 

Title of Referral: Image Resources NL/Mining/90 kms north of Perth, along Brand Highway, Shire of Gingin/WA/Boonanarring Mineral Sands Mine 
Date Received: 06 Feb 2014 Reference Number: 2014/7127 
Notification from EPBC Act Date of Notice Documents
  • Decision whether action needs approval/Approval Not Required
04 Mar 2014 http://www.environment.gov.au/epbc/notices/assessments/2014/7127/2014-7127-referral-decision.pdf
  • Invitation for Public Comment on Referral
07 Feb 2014 Referral PER - Boonanarring Mineral Sands 3.2 Mindarra North West Wetland Impact Assess Pt 2 3.3 Collard Wetland Investigation (Endemic) Pt 2 4.1 Groundwater (URS) Pt 1 4.1 Groundwater (URS) Pt 2 4.1 Groundwater (URS) Pt 3 1.1 Level 2 Flora, Veg & Groundwater Dependent Survey Pt 1 1.1 Level 2 Flora, Veg & Groundwater Dependent Survey Pt 2 1.2 Level 1 Flora & Veg Assessment Brand Hway 1.3 Impact Assessment Flora & Vegetation 2.1 Level 1 Vertebrate Fauna Survey 2.2 Subterranean Fauna Desktop Assessment 2.3 Short Range Endemics Reconnaissance Survey 2.4 Vertebrate Fauna Impact Assessment 2.5 Invertebrate Fauna Impact Assessment 2.6 Subterranean Fauna Impact Assessment 2.7 Black Cockatoo Habitat Study 2.8 Exam of Possible Black Cockatoo Nesting Trees 2.9 Black Cockatoo Impact Assessment 3.1 Mindarra North West Wetland Hydro & Eco Values 3.2 Mindarra North West Wetland Impact Assess Pt 1 4.1 Groundwater (URS) Pt 4 4.1 Groundwater (URS) Pt 5 4.1 Groundwater (URS) Pt 6 4.1 Groundwater (URS) Pt 7 4.1 Groundwater (URS) Pt 8 4.1 Groundwater (URS) pt 9 4.1a Groundwater (URS) - Addendum 4.2 Surface Water (URS) 5.1 Acid Sulphate Soil Risk Assessment 6.1 Dieback Mapping 7.1 Baseline Dust Monitoring 7.2 Air Quality Impact Assessment 8.1 Baseline Noise Monitoring 8.2 Noise Impact Assessment Pt 1 8.2 Noise Impact Assessment Pt 2 8.2 Noise Impact Assessment Pt 3 8.2 Noise Impact Assessment Pt 4 8.2 Noise Impact Assessment Pt 5 8.2 Noise Impact Assessment Pt 6 8.2 Noise Impact Assessment Pt 7 9.1 Baseline Soil & Overburden Characterisation 10.1 Traffic Impact Assessment 3.3 Collard Wetland Investigation (Endemic) Pt 1